Posts Tagged "HVAC"

Algonquin B HVAC Retrofit

Posted by on Oct 29, 2014 in Building Systems

Algonquin B HVAC Retrofit

Algonquin College, Building B HVAC Retrofit (ESCO) Siemens Canada, Ottawa, Ontario As part of a 20 year energy savings contract (ESCO) between Algonquin College and Siemens Canada, Building B required a complete retrofit of its forty year old HVAC systems. Miriton overcame the complexities and challenges of replacing the vintage systems, with ones selected for optimum energy savings, minimum maintenance and much improved comfort for the occupants.  The innovative solutions used to achieve the project’s goals include: variable volume air systems demand controlled ventilation energy...

Read More

Data Centre CRAC Units

Posted by on Oct 29, 2014 in Building Systems

Data Centre CRAC Units

Data Centre CRAC Units SNC-Lavalin O&M, Ottawa, Ontario The operator of a large data centre in Ottawa wanted to replace their entire cooling systems with systems that would have better reliability, complete redundancy, and deliver more accurate temperature and humidity control. They also required the replacement work to be completed while the data centre was fully operational, so they chose Miriton for the job. This project will give the data centre uninterrupted operation and stability of their critical environment.

Read More